MR. ROHIT RASTOGI MAINTENCE SERVICE SHOP, SCADA 1.3 Mission .. Figure 32: Weather proof reflective sticker .. Error! Both machine are in good condition. Identify public health and safety issues in electrical engineering working environment. 2.1 Nature of Activities Carried Out During the Training Programme. Hopefully with the Industrial Training which able to run to enhance the knowledge of students to enable them to contribute more effectively towards national development in the future and to get a job that suits them according to the skills they have learned. Clipping is a handy way to collect important slides you want to go back to later. . Ensuring that effective maintenance plans are in place for the maintenance of applicable equipment, that spares are available for the planned work, Key responsibilities. The electrosurgical have error alarm the CEMalarm and the red light are turn ON, the electrosurgical had be send to vendor to berepair. Forexample, in this situation I had troubleshoot many types of medical equipment tocorrective maintenance the breakdown such as repair the cot side rail of patients bed,replace the fuse of vital sign, replace the battery of defibrillator and vital sign machine,and troubleshoot the control box of patients bed.4.4 EMERGENCY BREAKDOWNEmergency breakdowns are the situation when the equipment is urgent to be repairedto maintain the quality of patient treatment at the hospital. Other than that, I had learned that wemust have the confident while doing work. This exercise can highlight the ability of students to work hard and to work with dedication and show a positive attitude to the employer. I had settel up the invoice duringthe lockdown during May to June. Figure 42: Wiring detail of measurement devices . 36 Do not sell or share my personal information, 1. Full Name. infrastructures, and public facilities division, while electrical engineering student will be Ms atirah had teach me how to open the LCD display using the proskit kit tools. Do not use the equipment ifsee any damage.Safety precautions: Always dilute cleaning agents according to the manufacturers instructions or use the lowest possible concentration. d) Establish and strengthen confidence in the performance of duties. 7) Press the print button to get the result of measurement. The Community Service is the provisionof care through our network of Clinic Wakaf An-Nur (KWAN) charity clinics. Chapter 3 - Lecture notes for Thermofluid, Kinematics - Statics Assignment - Truss, and Pulley system in Equilibrium, Q1, staggering - boleh guna untuk study study laaaaaa supaya pandai, Swinburne University of Technology Malaysia, International Strategic Marketing (MKT304), Bahasa Melayu Kerjaya (Sains dan Teknologi)(Local) (LM2026), Accounting System Analysis and Design (AIS655), Object Oriented Development With Java (CT038_3_2_OODJ), Partnership and Company Law I (UUUK 3053), Partnership and Company Law II (UUUK 3063), Business Organisation & Management (BBDM1023). The training began immediately following the completion of the semester 6 or 7 final Currently seeking professional industrial training experience with a reputable company. The Engineering Accreditation Council (EAC) also requires that students undergo the industrial training BEFORE they complete their academic studies. Remove the well from the monitor. -Engineering Software Analyst & Industrial Automation Engineer in MAPNA Electric & Control Engineering & Manufacturing Co (MECO) MECO is an international company, a technical design And a leading integrator of electrical . To pause allalarms for a predetermined time interval-audio pause mode, press the alarmsilence key twice quickly. COMPANY CLASSIFICATION (SIZE): SME, Large Enterprise, etc, No of employees All of the tables and figures should be prepared on computer. In addition, this exercise also introduces the students themselves in terms of ability, willingness, and attitude to the employer. Clean the monitor using the soft cloth with mild soap and water. Correctivemaintenance of panel screen display of Camera Atherex System. Its for the MRI chillerreplacement soon at KPJ Johor. Student industrial work experience scheme (SIWES) compliment students through exposure to practical aspect of their courses, having physical contact and interaction with staff and members of the general public. Copyright 2023 Thesiswire | Subsidiary of Taolad Integrated Services. The condemn letter mustbe send to finance. 1.3 Infrastructure Division .. After that, I meet with En . Academia.edu no longer supports Internet Explorer. Mechanical Engineering Handbook, Air Conditioning and Refrigeration by Rex Miller.pdf, Handbook of Air Conditioning and Refrigeration(2), HANDBOOK OF AIR CONDITIONING AND REFRIGERATION, Heating, Ventilating, and Air-conditioning SYSTEMS AND EQUIPMENT Inch-Pound Edition, Gene Strehlow (2) Building and System Analytics Dermot McMorrow (18) Mitsubishi Electric Canada, Gas turbine, HRSG, Combined Cycle, Steam Power Plant, Turbine maintenance workshop, INTERNSHIP REPORT ON INDUSTRIAL TRAINING AT GHORASHAL TRAINING CENTER (GTC), Electrical Power Systems Technology Third Edition. 2. Acknowledgments are usually unnecessary in a student report. Weve updated our privacy policy so that we are compliant with changing global privacy regulations and to provide you with insight into the limited ways in which we use your data. of Engineering (Hons) Electronic Engineering (EE241) to complete eight weeks of a administrative works, and some minor works related to their field of studies. The VS4 fuse are blow cause thebattery cant be charge and the power chord already spoilt. INDUSTRIAL TRAINING REPORT AT BLUE STAR LIMITED, JASOLA, DELHI . by the council, Figure 5: Tuan Haji Syed Khairol Anuar bin Syed Abidin, SDK., AMK., BCK, ASK e) Instill teamwork and good relationships with other employees. b) Planting teamwork and good relations between workers and employees of an organization. In conclusion, the objective of the training period is to: a) To expose students to the real working environment. Change the warmerunit side connecter bed broken at nursery. Figure 31: Junction box kit (manhole) . Error! In every phase of the project, hissupervision and guidance shaped this report to be completed perfectly.I would like to express my gratitude & respect to my Academic Supervisor Dr.Baharuddin bin Mustapha did not forget the encouragement and guidance given duringthe training period. Students also viewed. 1.2 MPSPK Logo . Use a soft cloth to clean the display window to prevent scratching. fabric of reality to all the consciousness, for I am truly grateful and felt blessed by His This chapter also explains how Maintenance works30 prevention and repair of damage with more detailed. These thriving sub-sectors holdtremendous potential for the future, in line with the increasing consumer demand.Our hospitals continue to be recognised by accreditation bodies such as the MalaysianSociety for Quality in Health (MSQH) and the Joint Commission International (XI).KPJ hospitals have been certified by Integrated Management System (IMS) thatintegrates and emphazies on the Quality Management System (MS ISO 9001:2015);Environment (MS ISO 14001:2015); Occupational Safety and Health (OHSAS18001:1999) Systems as well as other ISO and SIRIM certifications.KPJ has always kept the communities interest close to heart, and we reach out to theunder privileged through various channels. JAUNPUR, UTTAR PRADESH Industrial training report Chanaka Sudheera 5.8k views 94 slides CEB Presentation 2073 Chethiya Sathruwan 2.9k views 16 slides Ceylon Electricity Board Wickramarathne GT 6k views 98 slides Report of undergraduate training at ceylon electricity board Kulendran Anujan 1.1k views 54 slides More Related Content Slideshows for you (20) Student also need to apply curiosity throughoutinternship to gain knowledge during the internship. Student also need to practice beingmore friendly and not shy for asking if get any questions so that it is easy to acquireknowledge. Now the transmission line first parallel connected with lightning arrester to diverge surge, followed by CVT connected parallel. The scheme also gives the students the opportunity of familiarization and exposing them to the needed experience in handling the organization equipment which is not available in their various institutions and how to relate to their various customers since they are the king in any business oriented. Currently: Open to employment opportunities and continuing to pursue a Masters Degree in Electrical Engineering at Florida Atlantic University. I am the sole writer of this report. Figure 3.1.1 cot side rail patients bed LKL 16WEEK 2 ( 15 MARCH 2021 19 MARCH 2021) I had attend the T&C of warmer machine ( ATOM) at HDU,vendor had set up the warmer unit and do the EST test (IEC 60601-1). 294.6 TESTING AND COMMISSIONING (T&C)Testing and Commissioning (T&C) are the parts of installation equipment in thehospital. Learn faster and smarter from top experts, Download to take your learnings offline and on the go. Figure 34: MPSPK weather proof sticker label .. Error! Biomed staff of KPJ Johor are very friendlyand generous for sharing a lot of knowledge to me. -> . The paper will provide an overview on the UTP Industrial Internship Programme focussing on its objective and approach, management of the programme, operation and monitoring of progress, assessment method and challenges in running the programme. Moreover, Polytechnic needs to provide more initial exposure related tomedical equipment to student so that student more ready during the internship. at . This exercise is also important as it can get rid of inferiority complex while a student at the Polytechnic, but when students are in training it is likely he will meet with officials of high rank or attend meetings and provide jobs to foreign workers. Management department, Town Planning department, Treasury department, Secretariat INDUSTRIAL TRAINING REPORT CHUA CHONG LIANG Bachelor of Science (Hons) Quantity Surveying Lee Kong Chian Faculty of Engineering and Science Universiti Tunku Abdul Rahman December 2015. For instance, On 28hb EEG machine have land at KPJ Johor for T&C , assist by Ms Aina and MsJuwa. Ensure that AC outlet is properly grounded andsupplies the specified voltage and frequency (100-240VAC, 50-60 Hz). VEER BAHADUR SINGH PURVANCHAL UNIVERSITY Bookmark not defined. Exposing the IT Students to important facilities that can help them in their field of study. Right to appropriate grievance redress mechanism.5. Figure 38: Sample of conductors and cable terminators . Error! The SlideShare family just got bigger. Other than that, I had attend the breakdown ofelectrosurgical machine at OT room. many other aspects of town growth and well-being in Sungai Petani and Kuala Muda. All the institutions of higher learning in Malaysia that offer Engineering programmes have this requirement in their curriculum. You need to include certain ingredients to make them succeed. An industrial attachment report should have a minimum of 20 pages unless and otherwise advised by your lecturer The attachment report should be submitted upon completion of the attachment (the date of submission depend on Lecturer's instructions). They gave me a lot of exposure on the terms ofreference and procedures related to the process of my work. As an Industrial City 1961. . The value of voltage input and output are not stableand needs to calibrate. The students will be placed in government departments or private companies for 20 weeks to expose them to a real work environment and different from the atmosphere at the school. 2.3 Relationship of the Training to Course of Study; The related experience to the course of study is that of the practical work executed during the training which is based on employee interaction and general/staff satisfaction to achieve aims and objectives of the Company. defined. Sorting of some products that is needed to be disbatched. This training affords the students to be expose to both practical and theoretical aspect of what they have learnt in the class room. Figure 3.1 KPJ Johor outpatient building 153.2 SUMMARY OF INDUSTRIAL TRAINING ACTIVITIES WEEK 1 (5 MARCH 2021 13 MARCH 2021) Meet Pn Aisyah at Talent Management to report attendance as practical student at KPJ Specialist Hospital Pn Aisyah had explained about the few rules and guidelines as the practical student at the KPJ JOHOR. ashrea handbook 2016 HVAC Systmes and applications, Steam Power Plant UNIT 2 STEAM POWER PLANT, ASHRAE Terminology of Heating, Ventilating, Air Conditioning, and Refrigeration, Energy Efficiency Opportunities in the US Dairy Processing Industry, Cleaner Production~ Energy Efficiency Guidelines for the Integration of Cleaner Production and Energy Efficiency, SUMMER INTERNSHIP REPORT INDIAN OIL CORPORATION LIMITED (GUWAHATI), Docslide.us marine engineers review guide, C995ccf b49d 4082 9f94 a311ca8be19a 150904134540 lva1 app, ENGINEERING MANUAL OF AUTOMATIC CONTROL i HONEYWELL ENGINEERING MANUAL of AUTOMATIC CONTROL for COMMERCIAL BUILDINGS, Air-Conditioning and Refrigeration. Bookmark not defined. About us. Recognized VTU Research Centre), Basaveshwar Engineering College, Bagalkot-587102, TEQIP Lead Institute AICTE Recognized, Affiliated to, Department of Electrical and Electronics Engineering, Mr. Sangamesh. You can download the paper by clicking the button above. Training report on 33/11 kV substation CVT measures voltage and steeps down at 110V. A helpful LCD display and three simple buttonsmake it effortless to rapidly change parameters and view each signal output sent to thepulse oximeter immediately. The vendor had comeand set up the warmer unit and had do the EST (IEC 60601-1) to the warmer unit. Figure 3.14.1 EPOC machine.WEEK 15 ( 14 JUNE 2021 19 JUNE 2021)Voltage stabilizer MRI are problem, chargeman and CPSM had check the voltagestabilizer using the multimeter. Apart from that, the format report that needs tobe done by students after undergoing industrial training also can train each of the student inpreparing technical report that is complete, compact and in a right order that can be made asan important knowledge when they face a real situation later. Moral values and good attitude are really applied by the trainers. PETANI KEDAH Yang DiPertua Majlis Perbandaran Sungai Petani, MPSPK leadership is leaded by a chairman whose will be in charge for 2 years before replaced SUMMER TRAINING REPORT With input from the partnering organisation for the graduate programme, Industrial Training for Electrical Engineering Students in Chandigarh Mohali ThinkNEXT Technologies Private Limited provides best Six Months/6 Weeks (45 Days) Industrial Training opportunity for EEE, Electrical Engineering Students. Through this report, the experience gain can be delivered to their peers. 21WEEK 13 ( 31 MAY 2021 5 JUNE 2021)I had change the cot side rail with biomed technician Ms Aina, the LKL cot side railare broken maybe cause of the long-life span, so we had change it to the new to avoidthe patient from falling down during laying on the bed. department, Information Technology department, and Legal department. 264.2.1.3 Rigel 288+ Electrical Safety Analyzer Figure 4.2.1.3 Rigel 288 Electrical Safety Analyzer The Rigel 288+ electrical safety analyzer offers an accurate and fast solution for meeting international and local safety standards are using standard AA batteries, tests can be carried out for insulation, earth/ground bond testing, and touch or point-to-point leakage current testing. Other than that, I suggest tostudent for choose their internship place as close as they can with house for avoid thecosting during internship. Get the CEO and HOS signature. So that, the communicationskills are very importance in work. Gresham Smith accepts interns from accredited design schools in the areas of architecture, engineering, interior design, and planning. Project Reports Versus Lab Reports "Project reports and lab reports are like recipes. INDUSTRIAL TRAINING REPORT SESSION DECEMBER 2020 NAZATUL IZZAH BINTI ZAMRI 08DEU18F1010INDUSTRIAL TRAINING REPORT BY NAZATUL IZZAH BINTI ZAMRI 08DEU18F1010 KPJ JOHOR SPECIALIST HOSPITAL THIS REPORT BOOK IS SUBMITTED TO ELECTRICAL ENGINEERING DEPARTMENT AS FULFILLING PART OF THE CONDITIONS AWARD DIPLOMA IN ELECTRICAL ENGINEERING (MEDICAL)POLITEKNIK SULTAN SALAHUDDIN ABDUL AZIZ SHAH DECEMBER 2020 iiiiiiAKNOWLEDGEMENTSBismillahirahmanirahim, Assalamualaikum W.B.T Alhamdulillah, Praise be to Allah,Lord of the worlds. There are two situations which is corrective maintenance andemergency breakdown. If an opportunity given I will utilize my skills and knowledge at the best of my ability. Industrial Training Report 2021 Industrial Training Report 2021 University Universiti Teknologi MARA Course Electrical Engineering (EE220) Uploaded by Muhammad Asri Academic year 2020/2021 Helpful? The program should therefore regard as important as to our various course of study, since it is a pivotal tool to the success and development of any nation. (215507) As a student we also do not have to give up if faced with the difficultiesand always believe that there is various way of solutions to overcome all problems. During this training, I was given the opportunity tofollow the learning involved technical assistance related. The bed cant becontrol by using the remote control. The main bus 33KV is connected to grid located at Sector-25, INDIRANAGAR, LUCKNOW. Perbandaran Sungai Petani Kedah (MPSPK) involves consultancy and projects approvals, Benin City, Edo, Nigeria. Shall cooperate, participate, and comply with their medical care.2. Figure 3.9.1 PPM of TympanometerWEEK 10 ( 10 MAY 2021 11 MAY 2021)Checking the Opthalmascope , change the bulb and the battery. You can read the details below. The programme worth 16-credit hour, which is almost equivalent to a semester academic load and is, called Industrial Internship Programme. During my stay with the Company, I was involved in filling of the office Documents. After cleaningand disinfecting, check the equipment carefully. I hope with the implication of the Industrial Training, there will be no more anomalousfeelings when the students started working after they have finished their course later. Right to acceptable health care and to be treated with respect and dignity withinsurrounding of reasonable privacy2. Students must complete 12 weeks of industrial training to be eligible to graduate. (Electrical Engineering) Jagged Circle It is usually at operationtreatment equipment and ICU ward equipment. | Learn more about ENELY ALEX's work experience . Wirings and control systems for lighting. Khairulaiman bin Nordin, Ms. Saidatul Aina Binti Mohamad Yunusand Ms. Noor Athirah binti Mohamad Fudzi. The primary factor to enhance performance and productivity in any firm/organization/industry is training. Karnataka Power Transmission Corporation Limited, Bagalkot Zone, Submitted in partial fulfillment of the requirements for the degree of. Students should have completed required elective modules to be better The industrial attachment report should follow this format. Do not sell or share my personal information. REPORT: Format of the report is according the sample format. I am grateful to Zamri bin Mohammed Jaib (my father), NadzarineBinti Abdul Aziz (my mother), Sulaiman bin Mohd Noor (my stepfather) and myfamily members and my friends to constant guidance, support, and valuablesuggestions during this internship. c) Adopt and comply with safety regulations in the industry. . It also can build confidence with the experience and knowledge available. 35The parameter of NBP module.Parameter SpecificationSystolicDiastolic 30mmHg - 270mmHg (4.0kPa-36.0kPa)MAP 10mmHg 245mmHg (1.3kPa-32.7kPa)Pulse Rate range 20mmHg-255mmHg (2.7kPa-34.0kPa)Blood pressure 30bpm 300 bpmaccuracyPulse rate accuracy Accuracy: 2% from 70% -100%Initial Cuff Inflation Maximum standard deviation L 8mmHgTemperature Maximum mean error: bpmspecifications 40bpm - 100 bpm: 5bpm 101bpm - 200bpm: 5% of reading 201bpm 300bpm: 10% of reading Adult: 160mmHg (21.3kPa) Pediatric: 140mmHg (18.7kPa) Neonatal: 100mmHg (13.3kPa) Monitored mode measurement: 26.7 - 43.3 Predictive mode measurement: 34.4 - 40.6 Accuracy: 0.1 364.7.6 Breakdown Vital Sign 4. Do not immerse, autoclave, steam sterilize, or ultrasonically clean the monitor. Industrial Training is one of the requirements students of Diploma Course electrical engineering. 31324.7.3 Basic operations of Vital Sign 4.Setting up the monitorPhilips recommends that a battery is always installed in the monitor.Connect the power cord to the power connector on the monitors rear paneland to an AC power source. We had changed it with the new battery. 19WEEK 8 (26 APRIL 2021 29 APRIL 2021)Updated the details of maintenance record of biomedical equipment at AssetManagement System. Suspect the motor had problem and needs to troubleshoot. Along with my PG Diploma in Industrial Safety Management, from NAFS, Nagpur in 2019, I also passed my B. UNIVERSITI TEKNOLOGI MARA, NAME : PUTERI NUR SOFEA BINTI MOHD Enter the email address you signed up with and we'll email you a reset link. 25811976 Industrial Training Report. Featuring specialized stay- connected ECG posts to ensure secure lead connections, ProSim 8 is the preferred tester for patient monitor quality assurance and safety professionals.4.2.1.6 ProSimSPOTLightSpO2PulseOximeterAnalyzer Figure 4.2.1.6 ProSimSPOTLightSpO2PulseOximeterAnalyzerSPOTLight is lightweight and flexible with three custom pre-sets specially designedto make it the fastest and easiest-to-use pulse oximeter analysis device on the markettoday for SpO2 functional testing. | Learn more about Haneef Thameem's work . Aug 2021 - Present1 year 8 months. Ms Athirah had bring us to visit the all ward and treatment room at the KPJ JOHOR building. For internship students doing industrial training in Engineering Department are exposed to 2 . The purpose of the Industrial Training is to provide exposure for the students on practical engineering fields. The scheme exposed student to industrial based skills necessary for smooth transaction from the class room to the world to work. Bhd. They are very important in theses, journal articles, or company reports. UMANATH SINGH INSTITUTE OF ENGINEERING & TECHNOLOGY service, site visit with their supervisor, and etcetera. Task and Duties in college are. UNSW Engineering students who have Industrial Training as a program requirement, must complete 60 days of approved Industrial Training (IT) to graduate and qualify for accreditation by Engineers Australia (EA). Blessings and Peace be upon the Prophet Muhammad S.A.W, hisentire family, and his companions. In this Chapter, Iwill explain more way of working while undergoing Industrial Training at KPJ JohorSpecialist Hospital for 20 weeks. During this period, I was taught installation of electrical fittings in the office. The Company also offers expertise in allied contracting activities such as electrical, plumbing, fire-fighting and industrial projects, in order to offer turnkey solutions, apart from execution of . ON The students are required to pass before the Industrial Training is recommended for award of a diploma at any school. To browse Academia.edu and the wider internet faster and more securely, please take a few seconds toupgrade your browser. h) Honesty and responsibility in performing tasks. I also have update the calibration date and seriel number of equipment had do calibration in BEMS folder. Specifically, Planned Maintenance isa scheduled service visit carried out by a competent and suitable agent, to ensure thatan item of equipment is operating correctly and to therefore avoid any unscheduledbreakdown and downtime. 254.2.1 SPECIFICATIONS / TOOLS ARE USED FOR EST TEST ANDPERFORMANCE TEST DURING THE PLANED PREVENTIVE MAINTENANCE(PPM)4.2.1.1 ESA 620 FLUKE Figure 4.2.1.1 ESA 620 FLUKEThe ESA620 Electrical Safety Analyzer represents quality excellence in manualpreventive maintenance for the biomedical technician and clinical engineer thatperform tests on medical equipment. We are dedicated to being the preferred provider of care,with innovative use of technology, experienced doctors and well-trained staff whocollaborate to offer the best diagnosis and treatment plans.MissionDelivering Quality Healthcare ServicesOur mission is to improve the health of the people and the communities we serve. g) Raise awareness and increase student interest in the subject selected. Student's industrial work experience scheme (SIWES) is a programme designed by the industrial training (IT) especially for the training of students in various institutions . First and foremost, all praised to Allah s.w, the Creator of everything from a single DURATION, Figure 22: Direct-buried lighting pole type .. Error! Basaveshwar Engineering College, Bagalkot. Shall keep appointments and follow up treatment.3. Lastly, student needs to maintain ethics as practical student while undergoingthe internship to maintain the image of the Polytechnic. Shall so conduct himself/herself so as not to interfere with the wellbeing of otherpatients or providers of healthcare of facilities.6. With selections of three test loads, protectiveearth test currents, and two insulation test voltages this versatile product can be usedworldwide to test to their standard of choice. Limited, Bagalkot zone, Bagalkot., under the supervision of. A REPORT OF SIX MONTHS INDUSTRIAL TRAINING (14 PT.) Muhammad Firzi Mukhriz Bin Ali to get the sign and confirmation letter as pratical student at biomed department from Politeknik Sultan Abdul Aziz Shah. . SPOTLightsets up in seconds to send Peripheral capillary oxygen saturation (SpO2), heart rate,perfusion, transmission, artifact noise, and eight different manufactures custom R-curves to a pulse oximeter or patient monitor. Thoroughly dry all of the surface before replacing the well in the monitor. 1 Brief History and Background 1 Bookmark not defined. Its showed that the control box are problem andneeds to troubleshoot. Personally, I would like to thank to Encik Adizul Ahmad for FACULTY OF ELECTRICAL ENGINEERING (FKE) INDUSTRIAL TRAINING TECHNICAL REPORT SPECIFIC GUIDELINES FOR ALL FKE STUDENTS BEKG/BEKM (BEKU3695) & DEK (DEKU3118) Objective: One of the objectives of industrial training is to train students to prepare a technical report after completing their industrial training session. Thevendor has done performance test to check the warmer unit function.4.7 OPERATIONS OF SureSigns VS4 MONITOR 4.7.1 Introduction The SureSigns VS4 is a vital sign monitor that measure blood pressure, pulse rate, oxygen saturation (SpO2) and temperature. 4) Press the NBP interval key to get the NIBP interval menu. Sorry, preview is currently unavailable. I also improve my skills and understanding in thebiomedical engineering to another level because during my internship I had learnedhow to troubleshoot a lot of medical equipment under biomed technician guiding andI have also been exposed to various medical equipment. It is not so qualified, but it is to create awareness about the situation in the working environment. We had change the newpower chord of VS4. All undergraduate students undertaking a Bachelor of Engineering (Hons), including dual programs, and postgraduate students studying . Instant access to millions of ebooks, audiobooks, magazines, podcasts and more. We've encountered a problem, please try again. They will increase their understandingofproccessed based audits and risks based things. Other than that, the defibrillatorat physio are low battery. Without his kind direction and proper guidance,this study would have been a little successful. ZAKKI Summer practice report template. The staffat KPJ Johor are very helpful and friendly. students and teachers can enhance their character and professional skills. This is seen as an effort to provide working exposure to students such that they will have some practical experience prior to graduation. Figure 3.16.1 site visit for Linac replacementWEEK 17 ( 28 JUNE 2021 - 3 JULY 2021)Fridge medication at treatment room are high temperature, Mr Aiman had checkingthe temperature value of medication fridge and wait for vendor Bayna to troubleshootit. I have 8.5years experience in Teaching an Electrical Engineering in Government Aided College in Punjab (India). In the case of Universiti Teknologi PETRONAS (UTP), the requirement has been made compulsory for all engineering and technology students and the period has been extended to 32 weeks. REPORT ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME (SIWES) TRAINING PROGRAMME . Figure 39: Sample of cables, cable termination and assesories Error! Bookmark not The industrial watertube boiler typically produces steam or hot water primarily for industrial process applications, and is used less frequently for heating applications. giving enormous the efforts, time, patience, and concerns to fellow students. 2.4. The value of respect for those around him will arise within the student if the students Industrial Training heartfelt and sincere. Figure 30: New cable layout using cable ducting .. Error! In addition, following the Industrial Training, students can improve their own weaknesses to improve and think more rationally in the handle which had been given by the employer.